Maintenance of crusher
Time:2023-02-04 14:26:49 Author:Administrator Visits:133
Daily maintenance
1. Periodic inspection
A comprehensive inspection of the crushing equipment should be carried out before and after the machine is switched on and off every day, with particular attention to the wear and tear of wearing parts, so that they can be replaced in time to keep the equipment running steadily for a long time and avoid sudden breakdowns.
2. Grease (oil) replacement
Grease (oil) is the key to ensure the normal operation of the crushing equipment, which can ensure the normal operation of the machine and prolong the service life. The lubricating grease used should be determined according to the place of use, temperature and other conditions, especially when changing seasons, the appropriate lubricating grease should be replaced in time, and the dirt in the bearing and bearing seat should be cleaned when replacing.
3. Equipment cleaning
Crushing equipment is generally operated in the open air, and regular cleaning of the appearance of the diesel engine, chassis, and working device of the crushing equipment can play a role in descaling and decontamination. During the cleaning process, damage to various devices and components and oil leakage can also be found. When cleaning, be careful not to use a high-temperature water gun to rinse, so as not to cause malfunction due to water ingress.
Operational aspect
1. Start-up process
Before starting the machine, make sure that the reducer has been filled with reducer oil and the bearings have been lubricated.
Before starting the machine, first check whether there are any foreign objects in the crushing chamber and whether there is any damage to the wearing parts, and then start the machine after there is no abnormal condition.
Check whether the control switches are open and ensure that there are no safety hazards in the control box before starting the machine..#破碎设备#
2.Feeding process
According to the production capacity, feeding range and discharging range of the crusher, please keep the feeding operation even and continuous, and avoid too fast or too slow, so as not to cause material blocking and affect production efficiency.
3. initial screening
Materials will inevitably enter a variety of foreign matter, debris, at this time to do a good job of screening work is particularly important, can be added to the iron remover and other equipment to remove the debris, to avoid over iron phenomenon caused by equipment failure, downtime.
4. Complete crushing
The crusher should be stopped after crushing the remaining material in the crusher, do not let the material in the crushing cavity have storage; after the work is finished, the power switch should be turned off in time, the material scattered around the crusher should be cleaned, check the screws of the motor and reducer docking parts have no
Check that the screws in the motor-reducer interface are not loose.